PLAN BEFORE YOU DEPLOY

This tool walks you step-by-step through defining project goals, evaluating site conditions, selecting the appropriate ShoreSOX® system, and organizing materials, anchors, fill, vegetation, and tools.

Proper planning improves efficiency in the field, ensures system stability, and supports long-term shoreline performance.

sox-install-planning

PROJECT INFO

PRIMARY FIELD CONTACTS

PROPERTY OWNERS GOALS

Customer Goals will affect how a SOX system is installed. SOX systems can be manipulated to meet different slope requirements.

Stabilization
Beautification
Reclamation

SITE PREP

SOX site preparation is minimal:

  • Extend culverts
  • Remove large rocks
  • Move irrigation heads, if necessary
  • Clear large vegetation
  • DO NOT pre-grade the embankment

SITE CONDITIONS AND PREPARATIONS

MATERIAL ORDER

TECHNICAL MESH

Item 1

Item 2

ANCHORS

QUANTITY

Quantity of anchors may vary, and it’s important to have extras for the unexpected.
SOX Suggests:

  • For 6’ & 12’ systems: 80 anchors for every 100 LF of material
  • For 18’ & 24’ systems: 125 anchors for every 100 LF of material

FILL METHOD

Important Variables to Consider:

  • Material Type: Any fill material >150 microns is acceptable, but different materials compress differently, affecting volume.
  • Compression & Settlement: Some materials settle more than others, requiring additional volume to achieve the same coverage.

Fill Type

Select one option to continue.

System-Based Volume Estimates

  • 6’ systems: 25 yd³ per 100 LF (0.25 yd³/LF)
  • 12’ systems: 50 yd³ per 100 LF (0.50 yd³/LF)
  • 18’ systems: 75 yd³ per 100 LF (0.75 yd³/LF)
  • 24’ systems: 100 yd³ per 100 LF (1.0 yd³/LF)

*These are rough estimates based on typical installation conditions. Use them as a starting point for your own calculations.

VEGETATION

COMMON TYPES OF VEGETATION

  • Sod
  • Seeds
  • Plug
  • Plantings

SET UP TOOLS

Select all tools needed for this project (Reference Prep page, if needed):

  • Collect: Tools you already have/own that need to be delivered and used for this project.
  • Rent: Tools that will be rented and used for this project.
  • Purchase: Tools that will be purchased and used for this project.
Marking Tools
CollectRentPurchaseN/A
Marking Paint
Marking Wand
String Line
Sewing Tools
CollectRentPurchaseN/A
Sewing Needles
Braided Fishing Line
Needle-Nose Pliers
Sewing Machine
Stake Driving Tools
CollectRentPurchaseN/A
Drill
Rotary Hammer Drill
Gas Post Driver
Post Driver
Auger Drill Bit
Sledgehammer
Tethering Tools
CollectRentPurchaseN/A
Electric Cutter
Utility Knife
Heavy-Duty Scissors

SET UP TOOLS

Select all tools needed for this project (Reference Prep page, if needed):

  • Collect: Tools you already have/own that need to be delivered and used for this project.
  • Rent: Tools that will be rented and used for this project.
  • Purchase: Tools that will be purchased and used for this project.
Dirt Moving Tools
CollectRentPurchaseN/A
Wheelbarrow
Excavator Tamp
Site Dumper
Utility Vehicle
Dredging Equipment
CollectRentPurchaseN/A
Dredge Boat
Trash Pump
Filling Tools
CollectRentPurchaseN/A
Shovel
Rake
2x4

PLANNING SUMMARY

Review the printable planning sheet below. Use “Download Summary (PDF)” to print/save as PDF.

Printable Planning Sheet

PROJECT LOCATION

Street Address
City & State
Property Description

PRIMARY FIELD CONTACTS

Owner
Company
Name
Cell
Trainer
Company
Name
Cell
CSP / Installer
Company
Name
Cell

OWNER GOALS

Desired Outcome

SITE PREP

Preparation Plan
Notable Site Conditions

MATERIAL ORDER

Confirmed
Item 1
System Size
Linear Feet
Color
Item 2
System Size
Linear Feet
Color
Notes

ANCHORS

Total Linear Feet
Anchor Type
Total # of Anchors
Notes

FILL

Fill Method
Total Linear Feet
Total Cubic Yards
Notes

VEGETATION

Vegetation Type
Plant Spacing
Container Size
Notes

SET UP TOOLS

Collect
    Rent
      Purchase
        Notes

        FILL TOOLS

        Collect
          Rent
            Purchase
              Notes